Total project budget for medium glass fiber modified plastic twin screw factory


Table of Contents

Introduction: What This Budget Guide Covers

Planning the total project budget for a medium glass fiber modified plastic twin screw factory is less about guessing a single number and more about understanding how the money splits across equipment, building, utilities, and commissioning. Owners who treat the budget as one lump sum almost always underestimate the supporting systems that make a compounding line actually run. This guide walks through the full line composition, the real machine models that fit a medium-scale glass-fiber reinforced (GFR) compounding plant, and a transparent relative-cost framework that works in any currency region.

Kerke, a Wanplas factory, is the solution provider behind this guide. Kerke specializes in parallel co-rotating twin-screw compounding extruders and has more than 12 years of research, design, and manufacturing experience in this field. The Kerke plant covers 19,997 plus square meters, runs more than 2,000 machines worldwide, serves 70 plus countries, and operates with a team of more than 100 members. As a member of the Wanplas group, Kerke shares the group mission to “Warm Global Customers With China Plastic Machinery” and the group-wide service commitments that protect the buyer after the line is installed.

In this article you will learn how a medium glass-fiber modified plastic plant is built from raw-material handling to packaged pellet, how to express the total budget without exposing a hard currency figure, which Kerke KTE models match a given output target, what energy you should plan for in kWh per ton, and how to size the whole project around a realistic overall equipment effectiveness (OEE) target. Every cost reference uses a normalized cost index where the complete project equals 100 baseline points, so the structure stays valid whether you build in Asia, the Middle East, Europe, or the Americas.

The phrase “medium” matters. A medium plant in this context means a single main compounding line sized for roughly 600 to 2,200 kilograms per hour of glass-fiber reinforced compound, supported by gravimetric feeding, pelletizing, classification, packaging, and central dedusting. It is larger than a pilot or lab setup and smaller than a multi-line, fully automated compounding campus. Keeping the scale definition tight is the first step to a credible budget.

Composition of a Medium Glass-Fiber Modified Plastic Twin-Screw Factory

A glass-fiber modified plastic twin-screw factory is a continuous solids-processing line. Resin and additives enter as powders or pellets, glass fiber is introduced through a side feeder to protect fiber length, the melt is compounded in a co-rotating twin-screw extruder, and the strand or die-face cut pellet is cooled, classified, and bagged. The line looks simple on a flow diagram but contains many interdependent subsystems, and each subsystem carries its own share of the total budget.

The table below lists the functional blocks of a complete medium plant and the role each one plays. Treat this as the equipment bill of materials skeleton before any cost weights are applied.

Process BlockFunction in the LineTypical EquipmentRelative Cost Weight (points on 100)
Raw material receiving and pre-blendingStore resin and filler, pre-mix master batchesSilos, high-speed mixer, vacuum loader6 to 9
Gravimetric feeding systemMetered dosing of resin, filler, additives, and glass fiberLoss-in-weight feeders, side feeder, liquid feeder10 to 14
Twin-screw compounding extruderMelting, dispersing, devolatilizing, building pressureCo-rotating parallel twin-screw extruder (KTE series)34 to 42
Melt filtrationRemove gel and contamination before dieContinuous screen changer2 to 4
Pelletizing systemCut strand or die-face pellet, cool and dryAir-cooled die-face hot cutting or water-cooled strand system7 to 11
Classification and conveyingRemove fines, convey pellet to siloVibrating screen, air classifier, blower3 to 5
PackagingWeigh and bag finished pelletAuto weigh-and-bag unit, stitching or heat seal3 to 5
Central dedustingCapture glass-fiber and filler dustBag filter, centrifugal fan3 to 5
Utilities packagePower, water, compressed air, coolingChiller, cooling tower, air compressor, electrical panel10 to 14

The twin-screw extruder is the technical and budget center of gravity. In a medium glass-fiber plant it typically carries the largest single share because the screw and barrel configuration, the gearbox, and the drive must handle abrasive glass fiber and high filler loads without excessive wear. Glass fiber is introduced through a side feeder rather than the main feed throat, because dropping fiber into the melting zone lets the kneading elements chop the fiber to the target length while the side feeder meters it precisely. This single design choice drives both product quality and the feeding-system budget.

Dedusting is not optional in a glass-fiber plant. Cut fiber and mineral filler generate fine dust that is a housekeeping and respiratory hazard. A central bag-filter system tied to the feeders, pelletizer, screens, and bagging station is a required budget line, not a nice-to-have. Owners who skip it pay later in throughput loss and workplace risk, which is why this guide keeps it as a visible block rather than folding it into “miscellaneous.”

Kerke KTE-75D Co-Rotating Twin-Screw Extruder

When the output target lands in the lower-to-middle band of a medium plant, the Kerke KTE-75D is the natural main machine. It is a parallel co-rotating twin-screw extruder from the KTE series that runs from KTE-16B up to KTE-135D, so the 75 model sits in the proven middle of the range. Its screw diameter, L/D ratio, and screw-element layout are all configurable for glass-fiber reinforced engineering plastics such as PA6, PA66, PP, PBT, and ASA with glass-fiber loadings commonly between 10 percent and 50 percent.

The KTE series uses a computer-aided screw assembly with kneading co-type elements that give excellent self-cleaning. Self-cleaning matters in glass-fiber compounding because residue in the barrel between color or grade changes becomes a contamination source. The screw and barrel also show good interchangeability, which protects spare-parts inventory cost over the life of the plant.

SpecificationKerke KTE-75D (representative GFR configuration)
Screw geometryParallel co-rotating twin-screw
Screw diameter75 mm
L/D ratio40 (optimizable 36 to 48)
Main motor power200 to 280 kW, AC drive with inverter
Maximum screw speed600 rpm
Typical GFR output600 to 1,100 kg/h (depends on fiber and filler load)
Side feedingTwin-screw side feeder for glass fiber, up to 35 percent by weight
DevolatilizationOne or two vent zones with vacuum
Barrel heatingCast aluminum with air or water cooling zones
Control systemPLC with HMI, recipe management, data acquisition
Self-cleaningKneading co-type element design, high interchangeability

For a medium plant, the KTE-75D pairs with a gravimetric feeding skid of three to five loss-in-weight feeders: one for the base resin, one or two for filler or flame retardant, one for the glass-fiber side feeder, and an optional liquid feeder for coupling agent or lubricant. The result is a line that holds formulation within tight tolerance, which is exactly what automotive and electrical buyers require for glass-fiber reinforced compounds.

Kerke KTE-95D Co-Rotating Twin-Screw Extruder

If the business case calls for the upper band of a medium plant, or for running high-filler glass-fiber compounds at scale, the Kerke KTE-95D extends throughput while keeping the same control philosophy and spare-parts family as the KTE-75D. Because both machines share barrel-module and screw-element concepts, a plant that starts with one and later adds the other keeps training and inventory simple.

The larger free volume of the 95 model tolerates higher glass-fiber and filler percentages before the specific mechanical energy rises sharply. It is a strong fit for PP plus glass fiber plus talc, for PA66 plus 30 percent glass fiber, and for PBT plus glass fiber plus flame retardant where the additive package is dense and abrasive.

SpecificationKerke KTE-95D (representative GFR configuration)
Screw geometryParallel co-rotating twin-screw
Screw diameter95 mm
L/D ratio44 (optimizable 40 to 52)
Main motor power400 to 500 kW, AC drive with inverter
Maximum screw speed500 rpm
Typical GFR output1,200 to 2,200 kg/h (depends on fiber and filler load)
Side feedingTwin-screw side feeder for glass fiber, up to 45 percent by weight
DevolatilizationTwo vent zones with vacuum
Barrel heatingCast aluminum with water cooling zones
Control systemPLC with HMI, recipe management, remote monitoring ready
Self-cleaningKneading co-type element design, high interchangeability

Both the KTE-75D and KTE-95D feed the same downstream families: air-cooled die-face hot cutting for most glass-fiber compounds, or water-cooled strand pelletizing when the pellet shape and low dust requirement favor a strand route. Kerke supplies a full cutting and pelletizing system range, including water-cooled strand pelletizing, air-cooled strand pelletizing, air-cooled die-face hot cutting, water-ring die-face hot cutting, eccentric water-mist hot cutting, and underwater granulation, so the pelletizing method is selected to the product rather than forced by equipment limits.

Budget note: The extruder and its screw-and-barrel set are the highest single cost weight in the line, but the feeding system and pelletizing system together often approach the extruder weight. Plan all three together, not separately, or the budget will drift.

Investment Composition on a 100-Point Cost Index

Because this guide must work for buyers in any region, it expresses the total project budget as a cost index where the complete medium plant equals 100 baseline points. Each subsystem is then assigned a share of those 100 points. The shares below are representative for a greenfield medium plant built on leased or owned land, with the building constructed for the line rather than adapted from an existing hall.

Investment CategoryShare of 100-Point Cost IndexWhat It Includes
Process equipment52 to 58 pointsExtruder, feeders, pelletizing, classification, packaging, dedusting, lab instruments
Plant building and civil works22 to 28 pointsFactory shell, floor with load rating, pit, offices, warehouse
Utilities and infrastructure10 to 14 pointsPower transformer and distribution, water, compressed air, cooling, fire system
Installation, commissioning, training6 to 10 pointsMechanical and electrical install, alignment, trial run, operator training
Contingency and soft cost3 to 6 pointsPermits, engineering, freight, spare set at start

The dominant fact is that process equipment consumes just over half of the budget. Within that half, the extruder and feeding system dominate. The plant building is the second-largest block, and it is the one most sensitive to local construction cost, which is why the index keeps it as a separate, visible share rather than burying it.

A useful planning rule: if your local building cost is Low to Medium, more of the 100 points shift toward equipment and you can afford a larger or better-instrumented line. If local construction cost is High or Very High, the building share grows and you may need to trim utility or contingency points. The index makes that trade-off explicit instead of hidden.

Relative Cost Levels by Project Category

Beyond the share of 100 points, buyers benefit from a coarse level rating that compares a medium glass-fiber plant against other compounding projects. The levels used here are Low, Medium, High, Very High, and Premium. They describe relative cost intensity, not an absolute figure, and they help a procurement team explain the project to finance without quoting a currency number.

Project CategoryRelative Cost LevelWhy
Main twin-screw extruderHigh to Very HighHigh-torque gearbox, abrasion-resistant barrel, large drive
Gravimetric feeding systemMediumMultiple loss-in-weight feeders and side feeder
Pelletizing and downstreamMediumCutting, cooling, screening, conveying
Central dedustingLow to MediumRequired but mechanically simple
Plant buildingMediumVaries strongly by region
Utilities infrastructureMediumPower and cooling dominate
Instrumentation and softwareLow to MediumPLC, HMI, recipe and data system
Commissioning and trainingLowShort, one-time activity
Whole-project intensity vs masterbatch lineHighGlass fiber adds feeders, dedusting, wear parts

Compared with a simple color masterbatch line, a glass-fiber modified plastic plant is High rather than Medium because glass fiber drives three extra cost drivers: a side feeder, an upgraded abrasion-resistant barrel and screw set, and a stronger dedusting system. Compared with a Premium multi-line compounding campus, a single medium line is still only Medium-to-High on the whole-project scale, which is the sweet spot for many regional compounders entering glass-fiber reinforced engineering plastics.

Planning tip: Keep the wear-parts budget visible. Glass fiber is abrasive, so the barrel liner, screw elements, and side-feeder barrel consume a recurring share of operating cost. This is a running cost, not part of the 100-point project index, and it is covered later under spare parts.

Capacity Plan and Unit Energy Use (kWh per Ton)

Energy is the largest recurring operating cost after raw material, so it belongs in the budget conversation even though it is outside the 100-point capital index. For a glass-fiber modified plastic twin-screw line, specific energy consumption is best expressed as kWh per ton of finished pellet, because that unit stays meaningful across formulas and regions.

Product TypeSpecific Energy (kWh per ton)Note
PP plus 20 to 30 percent glass fiber, low filler210 to 300Lower melt viscosity, easier to pump
PA6 or PA66 plus 30 percent glass fiber280 to 380Higher melt temperature and drying load
PBT plus glass fiber plus flame retardant320 to 430Dense abrasive package, more devolatilization
High-filler glass-fiber compound (plus talc or CaCO3)300 to 450Filler raises torque and screw speed demand
Color or additive masterbatch (reference)180 to 260Lighter load, shown for comparison only

The drying load for hygroscopic resins such as PA and PBT adds to the plant utility budget through the dehumidifying dryer and the chiller, even though the extruder motor itself may sit in the lower part of the range. A medium plant should plan cooling capacity for both the barrel zones and the dryer, because barrel water-cooling and dryer regeneration can coincide at peak load.

Capacity planning should start from nameplate hours rather than from the peak hourly rate. A realistic medium plant runs the main line for about 6,000 to 8,000 hours per year after accounting for planned maintenance, grade changeover, and shift pattern. Multiplying the steady hourly output by the planned operating hours gives the annual tonnage, which is the number finance should budget against, not the catalog peak rate.

Glass-Fiber Reinforced Modified Plastic Applications

Glass-fiber modified plastics earn their budget because they replace metal and heavier engineering parts across industries that pay for stiffness, strength, and dimensional stability at lower weight. The Kerke KTE line is positioned for exactly these compounds, and the application map below connects the machine to end markets that a medium plant can serve.

End IndustryTypical GFR CompoundWhy Glass FiberRelevant Spec or Compliance
AutomotivePA6 plus 30 percent GF, PA66 plus 30 percent GFStrength-to-weight, heat resistanceDimensional stability, heat aging
Electrical and electronicsPBT plus GF, PA plus GFTracking resistance, stiffnessUL 94 flame class, RoHS, REACH
Power tools and appliancesPP plus GF, ABS plus GFImpact and creep resistanceUL 94 where required
Construction hardwarePA plus GF, PP plus GF plus talcWeather and load resistanceWeatherability, UV stability
Industrial partsPPS or PA plus high GFChemical and heat resistanceChemical resistance, HDT
Consumer durablesASA plus GF, PC plus GFColor stability, rigidityColor fastness, gloss control

For automotive and electrical buyers, the critical quality parameter is fiber-length retention and dispersion uniformity. The side-feeder route on the Kerke KTE line protects fiber length because the fiber is metered into the melt after the resin has softened, then cut by controlled kneading rather than crushed at the throat. The uniform dispersion also protects the mechanical properties that the end part designer specified, which is what lets a medium compounder win repeat orders.

Compliance language such as UL 94, RoHS, and REACH applies to the compounded product and the additives used, not to a certification claim about the machine. Buyers should confirm additive selection and test reports with their material supplier and testing lab; the extrusion line is the manufacturing tool that delivers the specified formulation consistently.

Requirement-to-Model Selection Recommendation

The single most common budgeting mistake is sizing the extruder to the peak hourly dream rather than to the realistic annual tonnage. The table below maps a stated requirement to the Kerke model that fits, using the KTE family plus the supporting product lines from the Kerke catalog. This is the anchor table for turning a budget into a bill of materials.

Stated RequirementRecommended Kerke ModelRationale
600 to 1,100 kg/h GFR compound, single lineKTE-75D co-rotating twin-screw extruderMiddle of medium range, full side-feeder support
1,200 to 2,200 kg/h GFR compoundKTE-95D co-rotating twin-screw extruderLarger free volume, higher filler tolerance
Formula development and pilot lotsLaboratory twin-screw extruderSmall batch, fast screw change
Two-stage devolatilization or heat-sensitive specialsKTE-SE double-stage extrusion systemMother-baby configuration for difficult materials
Special dispersion or high fill, sensitive shearTriple (3-screw) extruderExtra mixing without over-shear
Reclaim flake downstream of compoundingSE series single-screw extruder (30 to 800 kg/h)Matched recycling stage
Dust-free pellet, low finesAir-cooled die-face hot cutting systemClosed cut, minimal handling
Premium pellet shape, low dust, large volumeUnderwater granulation systemUniform spherical pellet at scale

The selection logic is deliberately simple: pick the model by steady hourly output, then add the feeding and pelletizing method by product, then size utilities to the motor and dryer load. A medium plant that follows this order avoids paying for a 135 model it will never fill, and avoids starving a 75 model that the market has outgrown in year two.

OEE and Capacity Utilization Planning

Overall equipment effectiveness (OEE) is the honest bridge between catalog capacity and the tonnage the budget can actually recover. For a continuous compounding line, OEE is the product of availability, performance, and quality. A medium glass-fiber plant should plan to a target OEE in the range of 75 percent to 85 percent, leaving room for grade changeover, planned barrel maintenance, and the inevitable minor stops of an abrasive process.

Availability is usually the weakest OEE leg in glass-fiber compounding because wear parts need scheduled replacement. Performance loss comes from running below the steady rate during start-up and grade transition. Quality loss appears as off-spec pellet from poor dispersion or moisture, which is why drying and devolatilization must be budgeted as process steps, not afterthoughts.

OEE FactorTypical Medium-Plant RangeBudget Implication
Availability88 to 94 percentPlan wear-part change windows
Performance90 to 96 percentRate loss at start-up and changeover
Quality96 to 99 percentDrying and dispersion control
Resulting OEE75 to 85 percentUse for annual tonnage, not peak rate

A practical budgeting move is to size the line so that the required annual tonnage is reached at 80 percent OEE, not at 95 percent. The gap between those two numbers is the buffer that keeps the project financially alive when a barrel liner change takes a shift longer than planned. Capacity utilization, the share of available hours actually sold, should be planned around 70 percent to 85 percent in the first two years and can rise as the customer base matures.

Service, Support and Spare-Parts Policy

A budget is only realistic if it includes the support that keeps the line running after commissioning. Kerke, as a Wanplas factory, applies the group-wide service commitments that protect the buyer through the early production curve and beyond.

The Wanplas group provides USD 500 free parts every year as a complimentary annual spare-parts allowance, which directly offsets the wear-part consumption that glass-fiber compounding generates. In addition, damaged parts within the warranty period are replaced free of charge, and the open-factory policy welcomes buyers to audit the plant and inspect machines before shipment. Each equipment type carries an average of more than 10 years of experience per the Wanplas engineering team, which shortens the learning curve during installation.

Before delivery, Kerke runs the line through testing and, where the project scope allows, continuous operation checks so that start-up risk is reduced on the buyer’s floor. On-site installation and commissioning are handled by engineers who align the line, tune the recipe on real material, and train the operator team on screw change, cleaning, and basic fault response. Remote monitoring and recipe management on the PLC let the Kerke team review process data and support faster troubleshooting from a distance.

For a glass-fiber plant, the most valuable recurring support is the wear-part plan. The barrel liner, screw elements, and side-feeder barrel should be stocked as a matched set, and the annual spare-parts allowance should be applied first to the highest-turnover items. Treating spare parts as a planned line in the operating budget, separate from the 100-point capital index, is the discipline that separates a line that runs from a line that limps.

Plant Layout, Floor Load and Logistics Planning

The building share of the 100-point index is sensitive to floor load rating, bay height, and the logistics path from raw material to loaded truck. A glass-fiber modified plastic line is heavier than it looks because the loss-in-weight feeders, the side feeder, and the filled resin silos concentrate mass on a small footprint. The extruder itself sits on a reinforced foundation, and the pelletizing and bagging area needs a clean, separated zone so finished pellet never crosses the raw-material dust path.

A practical medium plant layout separates three flows: the powder and filler receiving zone with its own dedusting, the compounding core where the KTE extruder and feeders live, and the finished-pellet zone with screening, silo, and bagging. Keeping these flows apart reduces cross-contamination during color changes and shortens the cleaning sequence that protects availability. Bay height should clear the feeder stacks and allow an overhead hoist for barrel and screw changes, because lifting a twin-screw barrel by crane is far safer than manual handling during maintenance.

Logistics also drives a hidden cost: buffer silos between receiving and feeding smooth the line when a resin truck is late, and a finished-pellet silo plus auto bagging lets the line run while the warehouse team loads out. For a medium plant, one day of resin buffer and one shift of pellet buffer is usually enough; over-building storage adds building points without raising throughput, so the budget should size buffer to the supply-chain risk rather than to a worst case that never happens.

Recurring Operating Cost Outside the Capital Index

The 100-point cost index covers capital only. The budget that finance actually lives with is the operating cost per ton, which has its own structure and should be planned alongside the capital index, not after it. The largest recurring block is raw material, which is outside machine scope, but the machine-controlled blocks are energy, wear parts, labor, and consumables such as screen-pack media and bag film.

Energy, expressed earlier as kWh per ton, is the biggest machine-linked operating cost and the one most affected by screw and barrel configuration. A well-matched KTE screw layout that reaches target dispersion at lower specific energy pays back continuously, which is why the extruder weight in the capital index should be judged by lifetime energy, not by purchase price alone. Wear parts are the second machine-linked block; glass fiber shortens barrel-liner and screw-element life, so a planned replacement calendar supported by the annual spare-parts allowance keeps availability in the 75 to 85 percent OEE band.

Labor for a medium single-line plant is typically one to two operators per shift plus a part-time supervisor, and the PLC recipe management reduces the skill needed for grade changes once the first recipe is tuned. Consumables are small but recurring: screen-pack media at the continuous screen changer, bag film at the packaging unit, and filter bags at the dedusting system. None of these is large alone, but together they define the true cost-to-serve that separates a profitable glass-fiber compounder from one that wins volume and loses margin.

Process Section Detail: Side Feeding, Vacuum Devolatilization, and Melt Filtration

In a glass-fiber modified plastic twin-screw line, three process sections decide both product quality and a meaningful part of the capital and recurring cost: the side feeding of glass fiber, the vacuum devolatilization through vent zones, and the melt filtration performed just before the die. On the Kerke KTE platform these three sections are engineered as separate, configurable modules so the configuration can be tuned to the resin, glass-fiber percentage, and filler system without redesigning the whole extruder. Treating them as distinct budget items keeps the cost structure honest instead of folding them into a single machine price.

The side feeding section is built around a twin-screw side feeder that introduces glass fiber into the melt after the base resin has softened. Metering is by weight, and the side-feeder barrel turns at a speed matched to the main screw so fiber is conveyed without bridging, surging, or overheating. On the KTE-75D the side feeder handles glass fiber up to 35 percent by weight, and on the KTE-95D up to 45 percent by weight. Because glass fiber is abrasive, the side-feeder barrel and the metering screw are wear parts with a relative cost level of Medium, and they consume a planned share of the annual spare-parts allowance described earlier.

Vacuum devolatilization removes moisture, residual monomer, and trapped air that would otherwise appear as voids in the pellet and as a drop in mechanical properties. The KTE line uses one or two vent zones with vacuum, positioned downstream of the melting and high-shear kneading zones. For hygroscopic resins such as PA and PBT, two vent zones are recommended because the drying load and the hydrolytic risk are higher. Devolatilization is a process step, not free: it adds to the utility budget through the vacuum pump and through the barrel cooling that keeps the vent zone from overheating during long runs.

Melt filtration sits immediately before the die and protects the pelletizing system from gel, agglomerated filler, and foreign contamination. A continuous screen changer performs this task without stopping the line, and it is the lowest single cost weight among the three sections. The screen-pack media is a recurring consumable, so its replacement frequency is part of the operating cost per ton rather than the 100-point capital index.

Process SectionRole in the LineRelative Cost LevelBudget Note
Side feeding of glass fiberMetered fiber into melt, protects fiber lengthMediumPart of the 10 to 14 point feeding share; wear-part driven
Vacuum devolatilizationRemoves moisture, monomer, air before dieLow to MediumBuilt into barrel vent-zone count; adds vacuum and cooling load
Melt filtrationContinuous screen changer before dieLow2 to 4 points on the 100-point index; screen media is consumable
Barrel cooling at vent zoneStabilizes vent temperature during runLow to MediumPart of the 10 to 14 point utilities share

The practical budgeting lesson is that side feeding and vacuum devolatilization are quality gates, while melt filtration is a protection gate. A line that under-specifies any one of them pays later in off-spec pellet, shorter screw and barrel life, or unplanned stops. The Kerke configuration team sizes each section to the target compound so the three gates match rather than one being oversized while another becomes a bottleneck.

How does vacuum devolatilization affect the budget?

Vacuum devolatilization adds modest capital through extra barrel vent zones and a vacuum pump, and it adds recurring utility load from the pump and the barrel cooling that stabilizes the vent. The payback is in quality: removing moisture and volatiles before the die protects fiber dispersion and mechanical properties, which means fewer off-spec batches and less rework. On PA and PBT compounds the second vent zone is usually worth the extra points.

Why is melt filtration needed even for virgin glass fiber compounds?

Even with clean raw material, glass-fiber compounding can generate gel from degradation or trap agglomerated filler and foreign particles from handling. A continuous screen changer removes these before the die so the pelletizing system is protected and the pellet surface stays clean. The screen changer itself is a low cost weight, but the screen-pack media is a recurring consumable that belongs in the operating cost per ton.

Frequently Asked Questions

What does “medium” mean for a glass fiber modified plastic twin screw factory?

A medium plant means one main compounding line sized for roughly 600 to 2,200 kilograms per hour of glass-fiber reinforced compound, with gravimetric feeding, pelletizing, classification, packaging, and central dedusting. It is above a lab or pilot line and below a multi-line automated compounding campus. Keeping this definition tight is the first step to a credible budget because it sets the equipment scale and the building footprint.

Why is the cost expressed as a 100-point cost index instead of a currency figure?

A cost index where the whole project equals 100 baseline points lets owners compare structure across regions without quoting a currency number that changes with exchange rate, freight, and local labor. The shares, such as equipment at 52 to 58 points and building at 22 to 28 points, stay valid everywhere. Buyers then apply their own local conversion to the index rather than trusting a single fixed number.

Which Kerke model fits a 1,500 kg/h glass fiber line?

A steady 1,500 kilograms per hour of glass-fiber reinforced compound sits in the KTE-95D band. The KTE-95D offers a 95 mm co-rotating screw, an L/D around 44, and a side feeder rated for high glass-fiber percentage. If the realistic annual tonnage is closer to 1,000 kg/h, the KTE-75D is the better fit and leaves headroom without overbuying drive power.

How much energy should I plan for per ton of glass fiber compound?

Specific energy for glass-fiber compounds typically falls between 210 and 450 kWh per ton, depending on the resin, glass-fiber percentage, filler load, and devolatilization demand. PA and PBT based compounds sit in the higher part of that range because of melt temperature and drying load. Budget cooling and drying capacity together, because they peak at the same time as extruder load.

Why does glass fiber need a side feeder instead of main feeding?

Glass fiber dropped into the main feed throat gets crushed before the resin melts, which shortens fiber length and weakens the final part. A twin-screw side feeder meters the fiber into the melt after softening, where controlled kneading cuts it to the target length and protects dispersion. The side feeder is a required budget line for any genuine glass-fiber modified plastic plant, not an upgrade.

What OEE should a medium compounding line target?

Plan to a target OEE of 75 percent to 85 percent. Availability is usually the weakest leg because abrasive glass fiber drives scheduled wear-part changes, while performance and quality losses come from start-up, grade changeover, and moisture or dispersion issues. Sizing the line to recover the required tonnage at 80 percent OEE builds in a buffer for real-world stops.

How does the USD 500 free parts policy help a glass fiber plant?

Glass-fiber compounding consumes wear parts such as barrel liners, screw elements, and side-feeder barrels faster than unfilled compounding. The Wanplas group provides USD 500 free parts every year as a complimentary annual spare-parts allowance, which offsets the highest-turnover items. Apply it first to the parts that stop the line, and keep a separate operating budget for the rest of the wear program.

Is a dust collection system really required in the budget?

Yes. Cut glass fiber and mineral filler generate fine dust that is a housekeeping and respiratory hazard and a contamination risk for color changes. A central bag-filter dedusting system tied to feeders, pelletizer, screens, and bagging is a required block, not optional. Skipping it trades a small saving now for throughput loss and workplace risk later.

Can the same KTE line make both glass fiber and masterbatch?

It can, with screw and barrel configuration changes and a careful cleaning program, because the KTE series uses self-cleaning kneading co-type elements with good interchangeability. Running glass fiber and color masterbatch on one line is practical for a medium plant, but budget changeover time and a verified cleaning sequence so one product does not contaminate the other.

What utilities capacity should the budget include?

Plan for power distribution sized to the extruder drive plus the dryer and chiller, cooling water or air for barrel zones, compressed air for actuators and conveying, and a dedusting fan. Utilities typically carry 10 to 14 points on the 100-point index. Undersizing power or cooling is the most common cause of a line that cannot hold rated output.

Conclusion and Next Step

The total project budget for a medium glass fiber modified plastic twin screw factory is best understood as a structure, not a single number. Process equipment takes just over half of the 100-point cost index, the building is the second-largest block, and utilities plus installation complete the capital picture, with contingency held separate. The Kerke KTE-75D and KTE-95D co-rotating twin-screw extruders cover the realistic output bands of a medium plant, while the loss-in-weight feeding system, side feeder, pelletizing method, and central dedusting decide product quality and recurring cost.

Energy should be planned in kWh per ton, OEE in the 75 to 85 percent band, and spare parts as a standing operating line supported by the Wanplas group USD 500 free parts every year allowance. As a Wanplas factory with more than 12 years in twin-screw compounding, 70 plus countries served, and more than 2,000 machines running worldwide, Kerke can take the project from configuration through commissioning and into steady production.

The next step is to send your target annual tonnage, the main resins and glass-fiber percentages you plan to run, and your local utility limits. Kerke will return a tailored line configuration, a cost-index breakdown for your region, and an invitation to the open factory to inspect the KTE line and discuss a sample trial run on your material. No fixed quote is needed to start the conversation; the structure above is the common language we will use to build your budget.

Video of Kerke’s Twin Screw Extruder and Other Machines

Watch more of our videos through our YouTube.

Main machines

Welcome To Visit Our Factory!
Get A Quote
Get A Quote